bank sand
英 [bæŋk sænd]
美 [bæŋk sænd]
网络 岸沙; 河砂; 河海丘砂; 细砂,河海丘砂; 岸砂; 细砂
双语例句
- Elsewhere, the Swiss central bank has drawn a line in the sand that it will not allow the franc to cross; the Koreans have effectively been managing the won rate for years.
就其他国家而言,瑞士央行就明确划定了瑞士法郎不可越过的汇率上限,韩国多年来也在有效控制着韩元汇率。 - The cost to construct the permanent engineering, which is for preventing the bank from flood using current normal method of construction on riverbed made of sand, is too high to be accepted.
如何利用现有的常规方法在粉细沙河床上修建永久防洪护堤工程,因其工程造价过高致使社会难以承担;为此,提出采用斜向灌浆护坡新技术修建永久性防洪护堤。 - There exist the different geomorphic types including the branching bay, submarine shoal, subfluvial bank, subaquatic delta, tidal current delta, tidal sand ridge, sand wave and caldron in the littoral zone.
滨海地貌主要有河口港湾、水下浅滩、水下岸坡、水下三角洲、潮流三角洲海底沙波、潮流沙脊、海釜等; - THE HOLE then we could also get axes and axes 'parallel lines in the left and right bank's tunnels for flood releasing and scouring sand.
运行程序可获得导线测量平差结果、放样左右岸泄洪冲砂洞轴线和轴线的平行线。 - Through analyzing the characteristic of river shape, cut-and-fill and projects along the bank, the influences of adjacent structure and dangerous dam section, which are made by river sand plant, are carefully analyzed.
通过成果分析,初步估算了勘察河段的砂源开采范围及开采总量,同时通过对河道的河势、冲淤及沿岸工程的特性,详细地分析河道采砂对附近建筑物、险工堤段的影响。 - Application on Technique of Filling Road Bank with Silt Fine Sand
粉细砂路堤填筑技术的应用 - According to the construction practice of the sand and cobble dock project in right bank of Zhuzhou navigational and electrical hinge, this paper introduced some points of making the filling and building with sand and cobble in the construction of the freshwater dock.
文章通过湖南株洲航电枢纽右岸砂石码头工程的施工实践,介绍了在内河码头建设中采用砂卵石填筑的要点。 - Soil seed bank type of fixed and semi-fixed sand dune was persistent soil seed bank ⅲ a, and the deeper the soil depth was, the fewer the soil density was.
固定半固定沙丘的植物种子表现为持久土壤种子库类型Ⅲa,并且随土壤深度增加,土壤种子密度显著下降。 - Even this week, he sought to throw sand in the faces of his accusers by implying the Bank of England had been complicit in wrongdoing.
上周他还暗示英国央行(bankofengland)是巴克莱不当行为的同谋,试图对他的指控者们进行抨击。 - The results show that the artificial bank was damaged over 10%, coastline receded, beach intensely eroded and silted, sand fearfully and run off, and the environment of coast and beach were deteriorated.
结果表明:人工护岸毁坏1/10以上、岸线后退,沙滩冲淤剧烈、沙源流失严重,海岸与沙滩环境恶化。
